Skip to content
All posts
Blog

NCC MVNO Business Rules: Nigeria's 120-Day Hosting Clock

Alexander Donskoy, Sales Director, Avante10 min readMVNO, Telecom, BSS

Nigeria’s draft MVNO Business Rules would give a host network operator 120 days to conclude commercial and technical agreements with a licensed MVNO, counted from the MVNO’s formal request. The Nigerian Communications Commission (NCC) published the draft in May 2026 and held a public inquiry on 16 July. As of late November 2026 the rules are not in force: we have found no commencement notice, and the draft itself says it takes effect on a date the Commission will specify. A licensee should plan around it anyway. The clock starts with a document the licensee writes, and most of the delay hides in that document.

The background is a gap the regulator can no longer ignore. The NCC has issued 46 MVNO licences. Two operators sell service nationwide: Vitel Wireless, a Tier 3 licensee hosted by MTN that launched in 2025, and Lebara, which runs on a Tier 5 licence held by VAS2Nets and began nationwide commercial operations on 14 September 2026 (Legit.ng). Our earlier article on the five NCC licence tiers looked at why the other licences sit dormant. This one is about what the draft rules would change, and what they leave on your desk.

What the draft Business Rules say

The document is titled Business Rules for Mobile Virtual Network Operations in Nigeria, Version 2.0, dated 10 April 2026, with the status “Amended Working Draft”. It supplements the Nigerian Communications Act 2003 and the MVNO licence conditions. It does not replace them.

For a company planning a launch, five parts of it matter:

  • An onboarding timetable with fixed deadlines for the host, covered in the next section.
  • A duty to host. Every host network operator must onboard and integrate all licensed Tier 4 and Tier 5 operators. Tiers 1 to 3 connect through a host, which can be a network operator or a Tier 4 or Tier 5 platform.
  • A regulated revenue share, built on a Benchmark Selling Price that the Commission sets for voice, data, SMS and USSD.
  • eSIM and remote onboarding. This is the first NCC text that covers them for MVNOs.
  • Record keeping and reporting that reach straight into the MVNO’s billing system.

It is still a working draft, and the hosts pushed back hard at the inquiry (more on that below). Expect the final text to differ in places.

How the 120-day clock works

The timetable sits in sections 8 and 9 of the draft and starts when the MVNO sends a written hosting request.

Step Deadline in the draft Who acts
Acknowledge the request and name commercial and technical leads 10 days from the request Host
Confirm readiness with an indicative timeline, or ask for more information 20 days from receiving the documents Host
Refuse, with written reasons sent to the MVNO and to the NCC The same 20 days Host
Open technical negotiations 10 days after a positive response Both
Conclude commercial and technical agreements 120 days from the formal request Both
Set up a joint working group and adopt a project plan 10 days after commercial terms are agreed Both
File the signed agreements with the NCC 14 days after signing Both

Source: NCC draft Business Rules v2.0, sections 8 and 9. Not in force as of November 2026.

Two details are easy to miss. The draft says a host’s internal approval processes cannot extend the 120 days. And the clock stops at signature. Integration, testing and connectivity follow “the agreed project plan”, with no fixed duration, and the process ends when both sides sign a Technical Readiness Certificate and notify the Commission.

So the rules, if adopted as drafted, cap the part of a launch the licensee could not control. They put no cap on the part it can. A licensee that signs on day 120 with no billing platform, no SIM supplier and no identity-verification flow has moved the delay from the host’s side of the table to its own.

Where the rules stand after the public inquiry

Written comments were due on 29 June 2026. The NCC’s report of the inquiry, signed by Executive Vice Chairman Aminu Maida on 20 August, lists submissions from 19 organisations and records no decisions. All of them go to a Technical Review Committee before the rules are finalised. No date is given.

The submissions show where the fight over the final text will be. There are two main disputes.

The first is mandatory hosting. EMTS, the company behind 9mobile, and Smile Communications opposed it and asked for commercial negotiation instead. MTN wanted objective onboarding criteria and broader hosting request requirements. Airtel wanted reciprocal obligations on MVNOs, stronger onboarding qualifications and more room to justify delays. On the other side, HyMobile called for mandatory wholesale access and stronger enforcement, and the MVNO association AMVON raised wholesale access, onboarding obligations and multi-homing.

The second is money. The draft’s indicative shares give the MVNO 25 percent of shareable revenue at Tier 1, 30 percent at Tier 2, 40 percent at Tier 3 and 50 percent at Tiers 4 and 5. MTN and Smile asked for flexible, negotiated shares. AMVON and Routelink raised revenue-sharing floors, and HyMobile asked for a higher Tier 5 share. VAS2Nets, the licensee behind Lebara, broadly supported the draft.

One host request is worth reading twice. MTN asked for protection against wholesale credit risk. Put simply, a host wants to know that the MVNO across the table can pay its wholesale bill and runs a platform that will not fall over in testing. Whatever the final rules say, every licensee will get that question.

What a licensee should prepare before sending a hosting request

Section 8(2) of the draft lists what a hosting request must state. Each item points to work that should exist before the letter goes out. The second and third columns are our reading. The draft does not spell them out.

The request must state What a host is likely to check What to have ready
Proposed service scope: voice, data, SMS, value-added services Whether the scope matches your licence tier Tier confirmed with counsel; product catalogue and tariff design in outline
Proposed integration model Whether you connect directly or through a Tier 4 or 5 platform, and on which interfaces A named platform vendor and a technical annex covering provisioning, online charging and usage record feeds
Target integration date Whether the date is realistic A platform delivery plan with stages and owners
Estimated capacity requirements Whether the forecast justifies the host’s effort Subscriber and traffic forecast by quarter for the first two years

Most of the preparation sits in the second row. A host cannot give a technical readiness answer in 20 days to a request that says “to be decided” under integration model. On Avante’s planning assumptions from delivered projects, a standard single-MVNO platform is ready in about three months, a Tier 3 style launch with its own BSS goes live four to six months after host and legal readiness, and a Tier 5 scope takes eight to ten. If the platform work starts on the day the host signs, those months come after the 120 days. If it starts before the request is sent, part of it runs inside them. Our launch page breaks the stages down.

What the draft would require from your BSS

Four provisions land directly on the business support system (BSS), the software that holds your catalogue, charging, billing and subscriber records.

The revenue share needs auditable settlement. Shareable revenue is the Benchmark Selling Price less permitted deductions, and the deductions are limited to verifiable costs: interconnect for voice and SMS, bandwidth for data. Section 10(11) requires billing records, call detail records, recharge data, bundle usage, discounts and settlement reports to be kept in a form that supports reconciliation and independent verification by the Commission. An MVNO that relies on the host’s figures alone has nothing to reconcile against. Our explainer on billing mediation covers how those records are collected.

Reporting is wide. Section 15 lists onboarding status, traffic, settlements, numbering use, SIM and eSIM statistics, complaints, outages and quality indicators, on a periodic and ad hoc basis. Assembling that by hand every month is a cost that grows with the subscriber base.

eSIM onboarding has preconditions. It may start only when identity checks, activation controls, fraud checks, audit trail and record retention meet regulatory standards and can be inspected. Outsourcing the technology to a host does not move the responsibility: the MVNO stays accountable. In Nigeria that means verification against the National Identification Number database inside the activation flow.

Numbering follows the tier. Tiers 1 and 2 use host numbering. Tiers 3 and 5 may request their own ranges, as Vitel did with 0712 and Lebara with 0724, which brings number management and porting into scope.

What the rules do not solve

Three things stay outside the draft.

Switching hosts is not addressed, and there is no general multi-host framework. AMVON and Telewyz asked for multi-homing at the inquiry. Until the final text says otherwise, the protection against dependence on one host is architectural: a BSS that treats the host as one wholesale counterparty among several.

Capital is untouched. Technext reported in August 2026 that each MVNO needs to invest an estimated NGN 5 billion to 20 billion before launch, and that vendor fees, software licences and host negotiations are priced in dollars while revenue comes in naira. A deadline on the host does nothing about that gap.

Enforcement is unproven. The draft gives the NCC sanctions for onboarding delays and discriminatory treatment, but none of them has been tested yet. The law firm S.P.A. Ajibade & Co., reviewing the draft in May 2026, also warned that the compliance load may raise costs, particularly for smaller and less technologically mature MVNOs.

South Africa shows the size of the prize when hosting works. Africa Analysis counted about 4.4 million active MVNO SIMs there at the end of 2025, up roughly 43 percent in a year (ITWeb, August 2026). Our South Africa guide explains how that market opened.

Where Avante fits

Avante supplies the BSS a Nigerian licensee runs behind its hosting request. For a Tier 3 or Tier 5 operator that means the product catalogue, Avante OCS for real-time charging, convergent billing, CRM, self-care, provisioning and mediation to the host, number portability, identity-check integration and regulatory reporting, with interconnect billing for a Tier 5 scope. For a Tier 4 enabler or aggregator the same stack runs multi-tenant, with a catalogue and settlement per hosted brand; see the MVNE and MVNA platform page. It is deployed on-premises or in a private cloud when subscriber records must stay in the country, or as a managed service. Avante does not run a network or hold a licence. The host agreement and the NCC relationship are yours, and we help prepare the technical annex. The platform page lists the modules and host interfaces.

If you hold a licence and have not sent a hosting request, the useful work this quarter is the request pack: tier, integration model, platform plan and forecast. Talk to our team about the technical annex.

Frequently asked questions

Are the NCC MVNO Business Rules in force?

No. Version 2.0 is an “Amended Working Draft” dated 10 April 2026. Comments closed on 29 June 2026 and the public inquiry was held on 16 July. The NCC’s report says a Technical Review Committee will review submissions before finalisation and gives no date. The draft takes effect only when the Commission specifies a commencement date.

What is the 120-day rule for MVNOs in Nigeria?

Under the draft, a host network operator must conclude commercial and technical agreements with an MVNO within 120 days of the MVNO’s formal hosting request. The host must acknowledge the request within 10 days and confirm readiness or refuse in writing within 20. Internal approvals cannot extend the limit. Integration and testing have no fixed deadline.

Can a host network refuse to host an MVNO in Nigeria?

The draft allows a refusal only with written reasons sent to both the MVNO and the NCC within 20 days, and it requires every host to onboard all licensed Tier 4 and Tier 5 operators. At the public inquiry, EMTS (9mobile) asked for broader refusal grounds, and EMTS and Smile opposed mandatory hosting altogether. The final position is open.

What revenue share does an MVNO get under the draft rules?

The draft gives indicative MVNO shares of 25 percent at Tier 1, 30 percent at Tier 2, 40 percent at Tier 3 and 50 percent at Tiers 4 and 5. The share applies to a Benchmark Selling Price set by the NCC, less permitted deductions such as interconnect and bandwidth costs. Hosts asked for negotiated shares, so these figures may change.

How many MVNOs are live in Nigeria?

Two operate nationwide as of November 2026, out of 46 licences issued. Vitel Wireless, a Tier 3 licensee hosted by MTN, launched in 2025. Lebara, operating on the Tier 5 licence held by VAS2Nets, began nationwide commercial operations on 14 September 2026 after a soft launch in Lagos in February.

Let’s discussyour project

Launching an MVNO or evolving your BSS? Let’s start with what you want to achieve.

Our team will review your request and email you to discuss the next steps.

Prefer email?info@avantebss.com